Completed work | Brisbane & SEQ

Real installations. Built for real properties.

A selection of electrical, solar, battery and air-conditioning projects completed by BESA Group across South East Queensland.

Solar • Battery • Backup

Holland Park

32 kWh Sigenergy battery with 9.5 kW solar.

A connected solar and storage installation designed to increase energy independence and keep the home supplied during an outage.

  • 32 kWh Sigenergy battery system
  • 9.5 kW rooftop solar array
  • Automated whole-home backup

Solar • Battery-ready

Brightview

8.55 kW solar installation prepared for future storage.

A new solar system built around a 10 kW Sigenergy inverter, providing a clear pathway for a battery addition when the household is ready.

  • 18 × 475 W solar panels
  • 10 kW Sigenergy inverter
  • Battery-ready system design

Electrical • Air-conditioning

Samford Village

Complete granny-flat electrical and 14 kW ducted air package.

BESA Group delivered the electrical scope from underground services and rough-in through to fit-off, commissioning and ducted air-conditioning installation.

  • Complete granny-flat electrical package
  • Underground services, rough-in and final fit-off
  • 14 kW ducted air-conditioning installation

Battery storage

Mermaid Beach

24 kWh GoodWe DC-coupled battery installation.

A battery-only upgrade using GoodWe equipment, DC-coupled to the property’s energy system for greater use of stored solar energy.

  • 24 kWh GoodWe battery
  • Battery-only installation
  • DC-coupled configuration

Battery storage • Backup

Jimboomba

36 kWh Sigenergy battery with automated whole-home backup.

A battery-only Sigenergy installation configured for DC coupling and automatic whole-home backup during a grid outage.

  • 36 kWh Sigenergy battery
  • DC-coupled battery-only installation
  • Automated whole-home backup

Plan your project

Looking for a practical electrical or energy solution?

Tell us about your property, energy goals and timing. We’ll help work out the right next step.